Pre-Contract
Post-Contract
Built to international standards, tailored to the local geographical characteristics.
Construction Period: 20/03/2018 – 15/05/2018
Architect: SOTIRIS AGAPIOU SERVICES
Structural Engineer: SOTIRIS AGAPIOU SERVICES
Mechanical Engineer: ———-
Electrical Engineer: ———-