Pre-Contract
Post-Contract
Centrally located, high-standard office tower, with flexible, all-inclusive, executive offices.
Construction Period: 01/09/2017 – 03/01/2019
Architect: ARMEFTIS & ASSOCIATES – ARCHITECTS AND DESIGNERS
Structural Engineer: ASD SOTIRIOU – STRUCTURAL AND CIVIL ENGINEERS
Mechanical Engineer: PRIME DESIGN CONSULTING ENGINEERS LTD.
Electrical Engineer: PRIME DESIGN CONSULTING ENGINEERS LTD.